842,000 SF two-level enclosed regional center, Cedar Bluff, Iowa. 3 physical anchors + 14-screen cineplex, 98 inline tenants, 3,900-stall parking field with a 3-level east deck. 175 monitored devices / 470 live sensor channels streaming into this model. The full 24-hour operating day of Saturday, 14 March 2026 is loaded — scrub, play, or jump event-to-event to replay exactly what the building did.
Every muted box is a leased space; every glowing pin is a physical device. Pins turn amber at warning thresholds and pulse red with a vertical beacon in alarm — visible through the glass envelope from any angle. Colorize re-skins the center by temperature, occupancy, energy intensity, CO₂, sales productivity, lease status or alarm state. Explode lifts L2 and the roof deck up to 300 ft off L1 — the camera re-frames as you lift and the glass envelope fades, so you can look straight into the concourses, RTUs, drains and PV array.
The six bars in the left rail plot live outside air, wind, humidity, barometric pressure, precipitation and roof snow load on a continuous scale. The shaded segment is the March normal range for eastern Iowa; the white needle is right now. Anything outside the band is called out with the deviation, so a facility manager can see at a glance whether the building is being asked to do something abnormal.
The Event Log is the day's operating record. Click any entry to jump the clock 3 minutes ahead of the incident, fly the camera to the asset, select it, and start playback at 300×. Weather particle effects pause with the clock so a frozen frame stays readable for screenshots and reviews.